The coated pipes 3LPE of HST –HSD project
According to the scope of work, PVID will implemented to coat 38km with 6, 8, 10, 16 inch of pipe using anti-corrosion coating 3LPE, insulation coating PUF, SPU and concrete weight coating. Expected on 15/6/2012, PVID will hand over the coated pipe to Thang Long JOC.
|