Provision of pipeline and bend coating services for Su Tu Vang South West project
· Investor: Cuu Long Joint Operating Company
· Total length of coated pipes: 16 km
· Pipe diameter: 6” & 10”
· Coating technology applied: Anti-corrosion for line pipes (3LPE), Anti-corrosion for bends (2LPE & 2LPP), Thermal insulation coating for line pipes (FBE+PUF+HDPE), Thermal insulation coating for bends (FBE+SPU), Concrete weight coating for line pipes.
· Year of completion: 2014
|