Provision of pipeline, bend coating services & installation of anodes for Thang Long – Dong Do project
· Investor: Lam Son Joint Operating Company
· EPC: PTSC M&C
· Total length of coated pipes: 20 km
· Pipe diameter: 6”, 8”, 10”, 12”
· Coating technology aplied: Anti-corrosion coating for line pipes (3LPE), Thermal insulaton coating for line pipes (FBE+PUF+HDPE), Anti-corrosion for bends (3LPE), Thermal insulation coating for bends (FBE+SPU), Concrete weight coating for line pipes.
· Year of completion: 2013
|