PVID transfer the line pipes to the coating plant to imlement Hai Su Trang/Te Giac Trang – Bach Ho Project
|
On 2 days 24th and 25th of Sep 2007, PVID held to transfer 2275 pipes with 12” of OD (each length pipe of 12,5m) from Phu My PTSC port to the coating plant to prepare for the line pipe coating of Hai Su Trang project. This project owned by PV Gas as investor and assigned to PVID for coating with a total length of 28km by anti-corrostion coating 3LPE and CWC method.
|
|
Pipes made by JFE Steel Corporation (Japan) and PVID signed the contract to Provision of line pipe with Marubeni Ituchu Tubulaurs Asia Ltd. |